πŸ—οΈ TOG‑WAJAALE MEETING HALL – REALISTIC DYNAMIC DASHBOARD

πŸ“… Start: 16 March 2026 | 🏁 Handover: 10 July 2026 | πŸ’° Budget: 25,731,513 Birr
βœ… Snapshot state: working day 30/98 Β· 36.9% progress Β· steel erection active Β· 80 days to handover | Use β—€/β–Ά to simulate future/past

πŸ“‹ Project Snapshot

πŸ“† Calendar days120
πŸ› οΈ Working days (Mon–Sat)0
🎯 Overall progress (cost‑based)0%
βš™οΈ Current phaseβ€”
πŸ“… Simulated working day0 / 0
⏳ COUNTDOWN TO HANDOVER β€”
*Progress = Earned Value (cost weighted) | Moves tasks, Gantt, budget dynamically | Countdown reflects simulated calendar days left until handover (10 July 2026)

πŸ’° Financial (BOQ split)

πŸ“Œ Total budget25,731,513 Birr
πŸ’Έ Earned value (spent)0 Birr
πŸ“‰ Remaining budget0 Birr
⚑ Pie = original BOQ categories | Earned value updates with each day

⚠️ Critical Actions & Logistics

β–ͺ️ Steel materials (I/H beams, plates, bolts) fully on site (cost captured)
β–ͺ️ Erection crew active – steel structure in progress
β–ͺ️ Substructure substantially completed ~92% as of day 30
β–ͺ️ Use navigation to see cost & task evolution

πŸ“… Construction Gantt β€” bar fill = % of task completed

πŸ“‹ Task Breakdown & Dynamic Progress

TaskPhaseStart dateDuration (days)Progress
🧱 Steel materials task represents procurement & site storage (cost ~4.5M). Erection started at day 27. Overall progress = weighted sum of task completions. Snapshot day 30 = 36.9% earned, countdown 80 days left.

🏁 Key Milestones

πŸ“¦ Steel material arrivalβœ… Completed day 6
πŸ—οΈ Erection startπŸ”œ Not yet
🧱 Substructure concrete🟒 progress varies

🏒 Awale GCC · Immediate Material Request (MRF)

SRS Tog-Wajaale City Meeting Hall | Contract No. TWCA OFED/CHB/007/2025

Purpose: Procurement of materials not available or partially available on site to prevent construction delays. (Values in ETB)

🚨 1. Materials Not Available on Site (Urgent)

No.DescriptionUnitQtyUnit Rate (ETB)Total Amount (ETB)
1Class β€˜B’ 200Γ—200Γ—400mm HCB wall with 1:3 cement mortar (both faces for plaster)mΒ²446.362,685.531,198,712.78
2PVC Downpipe Ø110mmml96.001,500.00144,000.00
3Imported Gypsum Board Ceiling (incl. Zigba battens, strip & spot lights)mΒ²400.005,076.002,030,400.00
4EGA / Perforated Galvanized Roofing Sheet 0.4mm (incl. ridge, gutter, washers)mΒ²396.333,374.001,337,227.54
5WPC Panel Sheet Interior Decoration (4.2Γ—5.2m area incl. lighting)mΒ²21.8413,125.00286,650.00
6RHS 80Γ—80Γ—3 mm (Truss & Braces)Kg1,262.53517.50653,358.91
7RHS 60Γ—60Γ—3 mm (Truss & Braces)Kg638.96517.50330,661.08
8RHS 80Γ—40Γ—3 mm (Purlins - Full balance)Kg1,953.38517.50917,093.52
Total for Not Available Materials: 7,998,104.63 ETB

⚠️ 2. Materials Partially Available (Balance Required)

No.DescriptionUnitTotal Value (ETB)Available Value (ETB)Balance Required (ETB)
1Universal Beam (I-Beam 200Γ—100Γ—10mm)ml715,530.000.00715,530.00
2βˆ…8 Crank BoltsPcs82,110.0041,055.0041,055.00
3RHS 80Γ—40Γ—3 mm Purlins (balance from above)Kg1,111,465.80194,372.28917,093.52
Total Balance for Partially Available Materials: 1,673,678.52 ETB

Total Requested Amount

9,671,783.15 ETB

(Not Available + Partial Balance)

Available on Site (No Action)

4,930,717.00 ETB

Universal Columns, Plates, J-Bolts

βœ… Materials Available on Site (No Immediate Action)

DescriptionUnitValue (ETB)Status
Universal Column (H-Beam 200Γ—100Γ—10mm)ml2,003,484.00AVAILABLE
Universal Column (I-Beam 200Γ—100Γ—10mm)ml2,599,759.00AVAILABLE
Plates 140Γ—150Γ—6 mmPcs48,300.00AVAILABLE
Plates 300Γ—300Γ—10 mmPcs182,574.00AVAILABLE
J - BoltsPcs96,600.00AVAILABLE

πŸ“‹ Justification & Urgent Request

Critical Path Items: Block works, Roofing & Steel Structure, Ceiling and Interior Decoration.

  • Any delay in these materials will halt structural progress and roofing works.
  • Gypsum ceiling and WPC decoration are required for interior finishing phase.
  • Steel truss and purlins are essential for roof installation.